Erection &
Commissioning

Site work handled by the people who understand the equipment


Erection is where design tolerances meet real-world site conditions, and it’s where most project delays and rework actually happen. ARIES sends supervisors and skilled fitters who know the equipment inside out, because in most cases, we built it, to manage mechanical erection, alignment, piping tie-ins and instrumentation coordination on your site.

Structured pre-commissioning checks and performance testing follow every installation before we hand the plant back to your operations team, ensuring what gets commissioned matches what was specified and avoiding surprises during startup.

/ Why It Matters

Why Choose ARIES for Erection & Commissioning

From lifting the first column to signing off the last performance test, one ARIES team stays on site and on the hook. We bring the crews who know the equipment, follow safety-documented procedures at every step, and don’t hand over until the installation performs exactly as designed.

Single-Point Accountability

One team carries responsibility from fabrication through startup, so there’s no finger-pointing between vendors when something doesn’t fit or align.

Experienced Site Crews

Supervisors and fitters who work on ARIES-fabricated equipment regularly, so erection follows the design intent rather than guesswork on site.

Safety-First Execution

Site work carried out under documented safety procedures, reducing risk during lifting, alignment and commissioning activities.

Performance-Verified Handover

Equipment isn’t handed over until it’s tested against its design performance, so startup risk sits with us, not you.

FAQ


Yes. While most of our erection work is on equipment we’ve built, we also take on erection and commissioning for equipment supplied by other vendors, working from your drawings and specifications.

All site erection is carried out under documented safety procedures for lifting, working at height and confined-space entry, in line with our ISO 9001:2015 processes.

It depends on equipment scale and site readiness. Share your project scope with us and we’ll give you an accurate schedule during consultation.

Yes. Handover includes a walkthrough with your operations team, along with as-built documentation and test certificates.

Yes. We regularly sequence our work around civil and other trade contractors on live sites, and we coordinate directly with your project team to keep the schedule aligned.

Contact Us


Head Office:
UNIT-2, NO.102B, 1ST STAGE, SOMPURA INDUSTRIAL
AREA,BENGALURU RURAL DIST.562111

Branch Office:
38-B1, NARYANPURA MAIN ROAD, 2ND PHASE, PEENYA
INDUSTRIAL AREA, BANGALORE – 560058

Phone: +91 9066 303037 / +91 99027 57677

Email: [email protected]